Assembly of eddy current brake frame to roller frame. It took thirty minutes hammering and taking turns. The coupler was was an interference fit, and so it had to be hammered on. See more about our home built senior design chassis dyno at: http://cot-wiki.tech.uh.edu/~cwfaldyn/
Link to this comment:
All Comments (0)