Two Vision Guided Denso Scara robots with dual conveyor tracking. The right robot tracks and picks parts off the outer belt and then places them onto the center conveyor leaving spaces for the left robot to place. The left robot tracks and picks parts off the outer belt and then tracks the spaces left by the right robot and places the parts onto the center conveyor. Runs 1/2 to 1 1/4" pvc tees, 45deg, 90deg and crosses. Up to 100 part selections with rates of 175ppm to 90ppm.
aaah he got one wrong at 0:30!!!
Woopee 7 months ago