Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Home Delivery Walkthrough: BURST*008

Loading...

Sign in or sign up now!
3,592
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jul 31, 2008

Learn more at: http://moma.org/homedelivery

Home Delivery: Fabricating the Modern Dwelling is both a survey of the past, present and future of the prefabricated home and a building project on the Museum's vacant west lot. Not since the mid-century House in the Garden series has MoMA built occupiable model buildings to demonstrate contemporary issues to the public. The fives homes erected on the vacant west lot are designed by Kieran Timberlake Associates (Philadelphia); Jeremy Edmiston and Douglas Gauthier (New York); Horden Cherry Lee Architects / Haack + Höpfner Architects (London/Munich); Massachusetts Institute of Technology School of Architecture and Planning / Associate Professor Lawrence Sass (Cambridge); and Oskar Leo Kaufmann (Dornbirn, Austria).

The exhibition, and its accompanying Web site (www.moma.org/homedelivery), display the process of architectural design and production in equal measure with the actual end result.

  • likes, 0 dislikes

Link to this comment:

Share to:

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more