Uploader Comments (muddymuddymuddmann)
All Comments (49)
-
To get an easier - smoother - faster - ready to cut/restart on steel, run a disk grinder over the area to be cut [front/back side] just enough to get rid of the rust/corrosion. Its amazing how much better the cut will be and easier to do.
Since you give out so much info, thought I'd share a little on cutting steel.
regards
-
@muddymuddymuddmann G'day Scotty... Yeah, a Time Machìne would be useful for that. For 40 years the Techno. advances & inflation balanced, so 1 hour of 1 Mil.Jet Engine = 1 Lb to Low Orbit. But then Computers arrived. Now, it's a tenth of a percent of the Purchase Price/Hour aloft. So the $10,000 Ultralight is $10, & a $37Million F-35 is $616.66 c.... per Minute, to switch it on. Military Farces don't care what it costs to defend their Worldview from Paranoia !
-
@coyleo1111 YA MAN THE PRICE KEEPS FLYING UP AND UP. IT'S LIKE GOLD INVESTING. I REALLY HOPE THEY GO DOWN SOON. AND YES THEY WILL DO JUST FINE. ALMOST PERFECT. JUST KEEP THINKING ABOUT THE MONEY SAVED ON THE BILLS. AND HOW LONG IT WILL LAST.
MUDDy
-
hi. me again i found a site in england that has the magnets wow the price is true the roof F648 - 50 x 25 x 10mm thick N42 Neodymium Magnet - 25kg Pull (x1) (D17/O) £3.33.00 witch is over 400 euros wood this price be right? i can get all other parts for 100 euro brake pads an stuff not the copper wire. you said 2" by 1" by half " so will them magnets do??? see i have 1 video up its a games room i build an want to get free elec in it to work a van heater. ?
Why aren't generators made out of permanent magnets? I can understand the lack of control but still, wouldn't that be endless power?
undertake782 2 weeks ago
@undertake782 OH BOY!, GREAT QUESTION. MAGNETS ARE EXPENSIVE, SO INDUCTION GENERATORS ARE CHEAPER TO MAKE. AND THE CAR ALTERNATOR USES ELECTRICITY FROM THE BATTERY TO GENERATE THE ELECTROMAGNETIC FIELDS TO SUBSTITUTE FOR MAGNETS. VERY INEFFICIENT. BUT THAT IS THE OIL GAME. IT DOESNT MATTER TO THE AUTO MAKERS THAT YOU USE 19 HORSEPOWER TO MAKE 1 HORSEPOWER(746 WATTS). OR A 15 PH ENGINE TO PRODUCE 3,500 WATTS ON A HOME GENNY. AS LONG AS IT USES GAS, OR OIL. THAT'S THE OIL GAME.
MUDDy
muddymuddymuddmann 2 weeks ago
@undertake782 ALSO SECOND PART... IT ALSO DOESNT MATTER THAT THE COMMERCIAL WIND TURBINES WITH 4 TO 4.5 FOOT PROPS FOR HOME USE, CAN ONLY PRODUCE THE RATED 1.6 KW IN A 36 MPH WIND, OR 200 WATTS IN 18 MPH, OR 25 IN A 9 MPH WIND. AS LONG AS THEY GET YOUR MONEY.
ALWAYS LOOK AT THE SIZE OF THE PROP FOR YOUR POWER COLLECTION ABILITY. DOUBLE THE WIND = 8 TIMES THE POWER. DOUBLE THE PROP DIAMETER = 4 TIMES THE POWER. DOUBLE BOTH AND GET 32 TIMES THE POWER. IMAGINE THAT!..& IRON CORE,& NO MAGs, 4GET IT.
muddymuddymuddmann 2 weeks ago
hey scott joe from east coast i have been busy lately i haven't followed you is this 24 the last video?thanks .joe
peppino66castro 1 month ago
@peppino66castro YES SO FAR JOE. WEATHER AND WORK, AND EMERGENCY FIXES HAVE KEPT ME FROM THE BUILD. THEN A FRIEND PILED A BUNCH OF PLYWOOD SCRAPS ON TOP OF IT, AND PROCEEDED TO UNLOAD THE REST OF THE TRAILER ON THAT. THE PILE STRETCHED FOR 15 FEET. WHEN I GOT HOME IT STARTED RAINING FOR 2 DAYS. AFTER 2 WEEKS I FINALLY FOUND SPARE TIME TO UNBURY IT. I'M GLAD I BUILT IT TOUGH. IT'S JUST FINE NOW. MAN I WISHED MY SHOP WAS BUILT.
MUDDy
muddymuddymuddmann 2 weeks ago
@muddymuddymuddmann G'day... Yeah, I thìnk I've heard of that one. The twist in the tail is that the Elite didn't get around to Building the Moon Base, let alone Colonise Asteroids, or Moons around the nearest Gas-Giant..! They flew 8-Engined Jetbombers, 578 of them, for 100,000 Hours each ; at $10,000 per hour, per engine... When 1 Pound to Low-Orbit was $10,000. If the US Dept. Def. had lost 1/2 it's Budget to NASA... They could've had 182 Moonshots, in 1969 alone !
WarblesOnALot 2 months ago
@WarblesOnALot NICE RESEARCH AND FIGURES.
LETS JUST BUILD THE TIME MACHINE AND TAKE A TRIP OUTTA HERE. 50 YEARS BACK. I THINK I COULD STAND TO BE DEMOTED DOWN TO ROOKIE.
MUDDy
muddymuddymuddmann 2 months ago