Loading...
Uploaded by tinabster on Oct 19, 2010
the steel constructions were done on 18.10.2010 and the concrete for the studio floor was poured and smoothed today 19.10.2010. also the garage floor's first layer was poured today
Travel & Events
Standard YouTube License
Load more suggestions
Link to this comment:
All Comments (0)