With the new Down Pore drainage groove, once Edge Gold flooring is installed, if the site sees a hard rain, water is channeled through the panel and off the joists beneath. No more sweeping off the water, no more drilling holes in the floor to let it through, and no more waiting an extra week (or more) for flooring to dry before installing finish material. Learn more about Down Pore at http://www.woodbywy.com
Link to this comment:
All Comments (0)