On March 31, New England Breeze, LLC installed a Northern Power Northwind 100 wind turbine. The Northwind 100 is a a 100 kw turbine. It has a 21m rotor diameter and a 37 meter tower. The turbine is located on the campus of Nature's Classroom in Charlton, MA. The machine is expected to generate approximately 100,000 kilowatt-hours per year. All of the power will be used on-site.
Too bad individuals cannot afford something like this. I am going with the skystream.
wolfie672 2 years ago