Upload

Loading...

This video is unavailable.

Ex-GE Engineer Highlights Critical Fukushima Reactor Design Flaw

Like this video?

Sign in to make your opinion count.

Don't like this video?

Sign in to make your opinion count.

Want to watch this again later?

Sign in to add this video to a playlist.

Published on Mar 8, 2013

In 1971, General Electric designed, built and delivered the first, now-exploded, Mark 1 reactor at the Fukushima Daiichi nuclear plant and that design was also used for four of the other five reactors.

Whistleblower Dale Bridenbaugh, a former engineer for GE, exposed a critical flaw in the
reactor design that was so bad, he recommended all Mark 1 reactors be shut
down to repair them. This didn't happen. Then, as now, profits and
protection of nuclear business were put ahead of safety and the
protection of people.

Loading...

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading...

Loading...
Working...
to add this to Watch Later

Add to