High Productivity Trench Blasting in Oman

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
18,721
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Nov 27, 2006

"Technical Drilling & Rock Blasting Co. LLC. Oman"

A 2km high productivity trench blast for Petroleum Development Oman using 10gm det cord and 17ms relays

Category:

Howto & Style

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:

Uploader Comments (dynamite333)

  • actually one can see how fast blasting cord porceeds : from 1000 metres per second to 2500 metres per second

  • @3NUNS

    The VOD of detonating cord is around 6,000m/sec & 7,000m/sec

  • Thank you,

    This video was only posted for visual effect, but rest assured the end result (Fragmentation) was typical of an high productivity trench blast of this type.

  • Very Very NICE trench!

  • Why thank you kind sir.

  • nice shot. how many holes in that trench

  • There was a total of 2500 holes with an average depth of 2.5m

see all

All Comments (28)

Sign In or Sign Up now to post a comment!
  • Probably the coolest thing I've seen all day

  • Very nice, any particular reason why you used det cord instead of shock tube?? Cost factor? Just curious :)

  • Cool.

  • its the roadrunner!!

  • That's flash running

  • @dynamite333 : Thanks.

  • this is very nice to see a long blast like that !!!!!!!!!! it's look like a fast train !!!

  • no, im just doing a project and need some dynamite video clips : )

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more