SDS pipeline excavation begins

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,105
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Aug 5, 2011

Crews recently began excavation for the installation of a 9-mile section of the Southern Delivery System (SDS) pipeline in southern El Paso County. The trench will be approximately 10-feet deep with 5-feet of ground cover over the 66-inch diameter steel pipe. For the entire SDS project, approximately 62 miles of buried pipeline will be installed originating at Pueblo Reservoir and ending in southeast Colorado Springs.

Category:

Education

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more