The project to build this turbine was managed by Kite Consulting the location is Bradworthy in Devon it is 25m to the hub and 34.5m to the blade tip. It produces electricity for a local dairy farm the owners of which have financed the project. Surplus electricity is fed into the national electric grid. It is the first of three similar projects in thelocal area providing electricity to dairy farms. The turbine is very quiet.
Hi beller32, If your in the UK you can get all the information you need from a dealer. They have been tested over a number of years and are one of, if not the quietest on the market.
DingleZilla 1 month ago
quite like the look of the endurance 50kw, however can anyone point me in the direction of any independent analysis of the turbine?
beller32 1 year ago