Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Temperence River Trail Reconstruction Video

Loading...

Sign in or sign up now!
1,946
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Mar 11, 2009

This trail reconstruction project was completed by the MN DNR and some of the MCC staff in a five day workshop with Willie Bittner of Great Lakes Trailbuilders. The workshop was designed to teach the MCC and MN DNR the same drystone masonary techniques that the CCC used when they originally build the trail in the early 1940's. Over the week stone staircases were rebuild, stone steps were added to the bottom of old staircase, gargoyles were added to the sides of the steps, stone crib walls were constructed and new staircases were built with stone from a quarry in the park.

Category:

People & Blogs

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more