Cost Modeling: The cost of doing business can be broken down into fixed and variable costs. Fixed or overhead costs remain constant from period to period, regardless of the amount and type of entities processed or services provided. Examples of fixed cost include rent, utilities and salaries. Variable costs are costs that are only incurred when processing entities or providing services, the more entities produced or services provided, the greater the variable costs. It can be very useful to know what the average variable cost is for a given type of product or service. It can also be nice to know the average unit cost, which is the average variable cost per unit plus the average fixed cost per unit where the average fixed cost is calculated using activity-based costing allocation method.
Process Simulator allows the modeler to determine either average variable cost or average unit cost. Cost can be accrued that are either time based (e.g., time spent using a resource or undergoing an activity) or event based (e.g., they are incurred whenever an entity arrives or when a resource is used). Thus Process Simulator considers both time-based and event-based cost drivers. When building a model, cost can be assigned to arriving entities, to activity times, or to the duration or times that a particular resource is used. Additional costs can be added (or deducted) in any Logic Builder using the IncCost command. This gives you complete control over when and how much cost should be added during a simulation.
Situation: Assign a raw material cost to an entity, which is the initial cost of the entity as it begins processing.
Example: Castings are processed through an engine line to produce car engines. The initial cost of the casting is $78.
Solution: The initial cost of the Casting (in Entity Properties) is set to $78.
If you are new to Process Simulator, you will first want to view our "Process Simulator Lite" Tutorial, available here: http://www.promodel.com/services/training/PCS/LiteTutorial/8.2/LiteTutorial.html
The model used for this example, as well as all of the modeling "how-to" examples, can be found in the ProModel Solutions Café (http://www.promodel.com/solutionscafe/howto/).
This video is part of our Process Simulator "How To" series, and is designed to accompany instructions available in our Process Simulator Help system. For more information, click here: http://www.promodel.com/onlinehelp/processsimulator/82/Process_Simulator_Help... and click on "Modeling How-Tos"
Category:
Tags:
- Costing
- Costs
- How To
- Process Simulator
- Visio
- predictive analytics
- ProModel
- discrete event
- simulation
- simulate
- process improvement
- tutorial
- Software
- Technology
- Software Tutorial
- How-to
License:
Standard YouTube License
-
0 likes, 0 dislikes
3:10
Waiting or Storage Costby ProModelSimulation29 views
2:17
Tracking Resource or Activity Time Costsby ProModelSimulation21 views
7:21
Management Accounting Five: Cost-Based Pricingby kenboydstl4,555 views
2:15
Tracking Per-use Costs for a Resourceby ProModelSimulation16 views
2:47
Arriving Entity Types are Randomly Distributedby ProModelSimulation42 views
1:27
Changing an Entity's Nameby ProModelSimulation24 views
9:19
Condition Dependent Batchingby ProModelSimulation35 views
2:40
Entity Creating Activities Solutionby ProModelSimulation21 views
2:31
Entity-Based Activities Solution A and Bby ProModelSimulation27 views
5:19
Processing Entity Batchesby ProModelSimulation28 views
3:57
Routing to a Previous Activityby ProModelSimulation17 views
3:00
Prioritizing Resource Access for Two Different Entity Types at the Same Activityby ProModelSimulation29 views
9:42
Variables and Attributesby ProModelSimulation38 views
4:30
Special "Pull" Situationsby ProModelSimulation51 views
3:10
Using Alternative Resources Solution Aby ProModelSimulation22 views
2:37
Conveyance Kanbanby ProModelSimulation48 views
4:16
Activity Time Solution A and Bby ProModelSimulation61 views
1:33
Modeling Setup and Changeover Downtimesby ProModelSimulation32 views
4:28
Time Dependent Batchingby ProModelSimulation27 views
2:28
Defining a One-time or Repeating Timerby ProModelSimulation17 views
- Loading more suggestions...
Link to this comment:
All Comments (0)