Upload

Loading icon Loading...

This video is unavailable.

Site 1 Impoundment Project (Fran Reich Preserve)

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like JaxStrong's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike JaxStrong's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add JaxStrong's video to your playlist.

Uploaded on Oct 21, 2010

The Site 1 Impoundment, also called the Fran Reich Preserve, will increase much needed water storage capacity and water management flexibility adjacent to the Arthur R. Marshall Loxahatchee National Wildlife Refuge.
The Site 1 Impoundment will capture and store excess water currently discharged to the Hillsboro Canal. The stored water will be available for use when water availability is low in the dry season. It will also reduce wasteful discharges to the Intracoastal Waterway, as well as water supply demands on Lake Okeechobee and the Loxahatchee Refuge. The impounded water will decrease the loss of water from the Loxahatchee Refuge caused by naturally occurring seepage. Other potential benefits include flood mitigation, water quality improvements and reduced saltwater intrusion.

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
to add this to Watch Later

Add to