We brought in over 100 tons of rock. Herbie built the bulkhead (rocks), the 2 piers, the rock walls, and the car port (out of railroad ties).
The step-down layering of the yard prevents run-off into the lake as well as soil erosion. Clay dirt from under the house was used to create level ground areas. Then Herbie laid cinderblocks and a floor and created a basement...
more on that later.....
Link to this comment:
All Comments (0)