Animation of installating bridge sections to Lövö Bridge in the Finnish municipality of Kemiönsaari. The installation technology was used for the first time in Finland and carried out with the help of a sea crane. The sections for the bridge are about 100 metres long and were lifted directly into place using a sea crane and welded together. Ruukki delivered the steel structures, including installation, for the bridge.
Read more about Ruukki´s bridge structures: http://www.ruukki.com/Products-and-solutions/Infrastructure-solutions/Bridge-...
Link to this comment:
All Comments (0)