Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Alberta- Bitumen Extraction Control Suite Design

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
409 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Oct 6, 2009

This control suite design was requested for the second floor of an administration building. It is a folded theater-style control room- a innovation to a traditional flat theater that allows the wings to be closer to the centrally-located supervisor on an elevated podium. Designed to allow a second phase expansion to be incorporated, it separates, yet allows collaboration with, a mine site control area from the balance of the control room. Training areas, conference areas, and DCS rack rooms are in close proximity.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more