For the replacement of the Hurricane Deck Bridge at the Lake of the Ozarks, Mo., Terracon was selected to perform the off-shore drilling, bridge assessment and underwater inspection to minimize the time and coordination for the client. Despite multiple severe winter storms, Terracon was able to provide the resources to meet the aggressive design schedule and minimize disruption to the traveling public.
Link to this comment:
All Comments (0)