Just after setting up the timing these clips show the chassis running on air at 30psi and 15psi for the slower running shots. Plenty of light oil was used on the motion and the paper towel shows dropped oil containing metal particles thrown out during the run in process. Total time to run in was 1 hour with frequent oiling of external and internal parts.
excellent video as I am considering getting a barrett loco.
please continue to show all future progress.
955trainboy 2 months ago