Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Blackhead Gorge Inter Urban Tunnel

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
30 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jul 4, 2011

Ocean narrates us through the tunnel!

Category:

Education

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • Blasting for the electric interurban railway in 1890 removed the last traces of almost all prehistoric stone carving. In October, 1890 an electric interurban was running from Newark to Granville. The line wasn't opened to Zanesville until 1903 due to difficulties cutting a pathway through the gorge. An interurban tunnel 19-1/2 feet high and 327 feet (100 m) long was blasted through solid rock to complete the job. The interurban ran on the opposite side of the Licking River from the B&O Railroad

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more