One Train: Part 3, Willamette Valley Pacing from Halsey to Harrisburg, Oregon 10-5-11

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
131 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Oct 10, 2011

A continuation from video 2 with closeups of the running Gevo units. Plenty of wheel movement and suspension travel. The two trailing units were not running since the power is not needed for the Valley portion of the run. As the train climbs the Cascades their power will be needed to make the summit.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • Great video! Thanks for posting it. Bill R

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more