Uploader Comments (muddymuddymuddmann)
Video Responses
All Comments (17)
-
@gwmiv YA SPEAKING OF PIA, I HOOKED UP THE WIND TURBINES LEADS TO THE BATTERIES BACKWARDS. lol
NOW I HAVE TO REPLACE THE DIODE BRIDGE RECTIDIERS. IT'S ABOUT A 15 MINUTE JOB IF I USE MY BUTANE SOLDERING IRON. I JUST HAVE TO DO IT ON THE ROOF. lol
LOTS OF FUN.
MUDDy
-
PITA situation that is...
-
Don't look too bad-just a PIA situation.
-
Ya part 7 shows the whole thing assembled and explains a few of the details of the auto furling mechanism.
Thanks
MUDDy
-
nvm i found it on PART 7
-
Its the best close ups of the whole mechanism and its workings after assembly . and immagine that only 900 views compaired to 17000 like my #2 how to vid. 3 out of 5 questions I get can be answered by this video. Thanks and good luck . dont hesitate to ask questions.
MUDDy
Good video...
peeweethe1st 1 year ago
@peeweethe1st THANKS DUDE! THJIS IS THE FIRST AND ONLY TIME IT EVER HAPPENED TO ONE OF MY WIND TURBINES. IT SEEMED TO BE OK AFTER I MOUNTED THE WIRES BACK A LITTLE FURTHER. THAT WAS SOME HIGH WINDS IN THAT DUST STORM.
MUDDy
muddymuddymuddmann 1 year ago
@muddymuddymuddmann I have Never been in a dust storm. Do you know how fast the wind was and the amps before it failed? I have a small house on the edge of a cliff over looking the sea, Its always windy, I have to try this...
peeweethe1st 1 year ago
@peeweethe1st 40 AND 50 MILE PER HOUR. I TIED THE WIRE TOWARDS THE BACK END AND IVE NEVER SEEN THIS PROBLEM AGAIN. YOU WOULD PROBABLY WANT A 3 1/2 OR 4 FOOT PROP FOR IT UP THERE. THIS WAS A 4 1/2 FOOT PROP. THE SMALLER PROP WILL SPIN FASTER FOR MORE POWER. AND THE SMALLER LENGTH OF PROP WILL HELP KEEP IT TAME AND STRONG.
MUDDy
muddymuddymuddmann 1 year ago