A look at how the Advanced Smoke Group installed the Britain's largest Automatic Opening Ventilation in Blackwall Tunnel.
The Blackwall Tunnel project lasted approx 18 months and required AOV's to be built into the existing ventilation shaft structures.
Through ingenuity and innovation the team were able to design and install the AOV, weighing 8.2 tonnes and 8.5 metres in diameter yet still capable of opening within 60 seconds in the event of a fire to allow for the safe extraction of smoke and other harmful gases.
The Advanced Smoke Group Consists of leading consultants with over 15 years expertise in their industry and is the centre of excellence in providing the very best smoke control solutions. Specialising in smoke control design; car park ventilation; manufacturing; site services and maintenance, the Advance Smoke Group are leaders in smoke control through their commitment to innovation and high quality, providing outstanding quality to all clients.
If you would like more information on the Blackwall Tunnel project or have any enquiries regarding smoke control, car park ventilation or pressurisation, either contact us on 0116 271 68621 or check out the website on http://www.advancedsmoke.co.uk or follow us on twitter: http://twitter.com/AdvancedSmoke linkedin: http://linkedin.com/company/advanced-smoke-group-ltd blog: http://advancedsmoke.blogspot.com facebook: http://facebook.com/pages/AdvancedSmoke
Link to this comment:
All Comments (0)