Nissan LEAF Production Site Groundbreaking Ceremony

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
640 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jun 9, 2010

Nissan recetly broke ground on the project that brings Nissan LEAF production to the United States. The groundbreaking ceremony marks the start of construction on a manufacturing facility in Smyrna, Tenn., that will produce the lithium-ion batteries that power the Nissan LEAF zero-emission vehicle. The all-electric Nissan LEAF will be produced at Nissan's vehicle assembly facility in Smyrna beginning in 2012.

Nissan LEAF and battery production will create up to 1,300 jobs when the plants are operating at full capacity. The battery plant, one of the largest vehicle battery manufacturing plants in North America at 1.3 million square feet at full capacity, will be capable of producing 200,000 advanced-technology batteries annually. It will be located adjacent to the vehicle assembly plant, which will be retooled to accommodate production of Nissan LEAF and will be capable of producing 150,000 electric cars annually.

Category:

Autos & Vehicles

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more