The 300 Km/h test run of CRH2C/E2-2000 on signal system for Wuhan-Guangzhou High-speed Railway was carried out by the contractor China Railway Group Ltd(CRG) on 11/11/2009, before the handover to the operator China Railway.
The Wuhan-Guangzhou HSR is going to be opened on 12/26/2009, run at average speed of 350km/h, with the highest speed of 390km/h, after 4 years' construction
Link to this comment:
Video Responses
All Comments (0)