Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

SR 16 - Westbound Nalley Valley - Computer animation of new westbound viaduct

Loading...

Sign in or sign up now!
5,220
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jan 5, 2009

View this animation of Westbound Nalley construction staging to get a feel for what driving on the new viaduct will be like.

Category:

Film & Animation

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (3)

Sign In or Sign Up now to post a comment!
  • I don't think beaman's complaint was of the WSDOT workers, but rather of the poor design of the interchange. Traffic design was still in its infancy when a majority of the interstate system was designed and built in the 50's-60's.

    It WAS a poorly designed interchange. We'll see how that all goes when this one is done. I'm sure it will be a bazillion times better, but full potential won't be realized until they complete eastbound viaduct, too.

  • Pretty much the only laborers in WSDOT are for maintenance and emergency response. All others are for quality control and design, ergo inspectors, surveyors, and engineers. Which to some may seem like a "waste," but if there was no quality control, there'd be a substantial amount of sub-par work and shady shortcuts made. Until you've actually interacted or have done research, avoid speaking out.

  • Its about time a engineer took a second look at that interchange. Problem solved.

Loading...
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more