Loading...
Uploaded by ReimersInc on Aug 14, 2007
Turn the boiler off and allow the pressure to drop to 5 psig. Open the blowdown valve for ten seconds, then close. Refill the boiler to the normal operating level. The blowdown procedure should be followed at the end of each working day.
Howto & Style
Standard YouTube License
Load more suggestions
Link to this comment:
All Comments (0)