Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

MOV00595

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
1,308
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Feb 1, 2009

This video shows a little bit more of the pile driving operation. This gets quite loud, as the pile driving rig is basically a 6,000 pound weight that gets repeatedly dropped from over 8 feet on to the end of the pile. This pushes the pile further into the ground, and is the basis of the foundation for the bridge. At this location, there was some difficulty in driving the piles, the ground was basically too hard. The contractor eventually brought out an even bigger hammer, 8,000 pounds.

Category:

Comedy

Tags:

License:

Standard YouTube License

  • likes, 1 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more