Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Union Station North Mezzanine "Partial Build" Scenario, PM Peak Period, 2030

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
324 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Oct 19, 2010

The above video illustrates the a future scenario (2030) for the "north mezzanine" of the Union Station Metrorail station during the evening peak period. This mezzanine connects the main terminal of Union Station (Amtrak, MARC, VRE) with 1st Street Northeast and the Metrorail platform. Individual passengers are represented as colored dots, with each color representing an eventual destination. For example, yellow dots represents passengers going to the Amtrak/commuter rail concourse. While most dots are narrow, the wider dots illustrate passengers with luggage who use the wider fare gates for easier Metro system access and egress.

The simulation shows the how planned improvements will greatly reduce crowding in the station. The full study and additional videos will be available on website of Metro's Office of Long Range Planning: http://planitmetro.com.

Category:

People & Blogs

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • WOW Very really to change a new build from Union Station this future.

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more