BE SURE TO CHECK OUT PARTS 2 and 3 of the tour:
Part 2: http://youtu.be/kE-2SYN14gk
Part 3: http://youtu.be/0XAlbsQlU0M
This is a rough, un-edited video tour of the Crown Point Mill. This section describes the grinding circuit and first stage of recovery in the primary thickener. The description is inaccurate in two places- first, the lime feeder is called a 'zinc feeder'... second, the ball mill is rated at 125 tons per DAY, not per hour.
Recorded on April 24, 2010 using a Flip Video camcorder.
Link to this comment:
All Comments (0)