Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

How To Hang A Paired-Panel

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
642 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Oct 26, 2009

This video was produced by Partition Concepts, Inc., which has more than 30 years of installation and service experience and is the exclusive Hufcor distributor throughout the state of Colorado, USA. Partition Concepts, Inc. is the parent company of Projector Screen and Partition Outlet which can be found at www.screensandpartitions.com

Hang a paired panel from the overhead track system using a two-wheel dolly & a ladder. The removable track escapement needs to be pulled out in order to load/unload panels.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (3)

Sign In or Sign Up now to post a comment!
  • It depends on the track system. Lower-rated track systems can hold numerous 400lb panles.

  • does anyone know how much weight does these things can handle the "overhead track system"

  • If you line the bottom of the panel under the the edge of the escapement opening, witht he trolley centered up on the track, you won't have to do as much walking of the panel.

    Good vid though. Great teamwork from the installers.

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more