Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Wild Blue Install - Part 20

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
2,614
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Nov 4, 2008

Wild Blue install outdoor completed. This install took the installer 1.5 hours to complete. The cable route is neat. There is weather proofing on all outdoor connections. The service loops are LARGE to allow proper function with the KA system. There are no sharp bends in the cables. The system is grounded to the home electrical from the grounding block. The TRIA is grounded to the dish. The pole is Wild Blue Approved and set 3' deep in 160 lbs of concrete.

Category:

Howto & Style

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (3)

Sign In or Sign Up now to post a comment!
  • @Rcrad14 yep. A sharp bend to me is a 90 degree.

  • I would be pissed if i saw that size loops on my house... nerds

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more