MODEL RAILROAD OPERATIONS ON THE RLD&M (PART 2)
Loading...
4,326
Loading...
Uploader Comments (rwundrock)
Top Comments
-
Great stuff, love the layout and the music!
see all
All Comments (10)
-
@rwundrock Very clever! Bridge works! I like it!
-
2:34, Funny dentures at the bridgeworks! Thanx fur sharin'!
-
Cool operation;)
- Loading comment...
Loading...
at 0:40, what is the switches used for? track turn or what? =)
fordlukebo 1 year ago
@fordlukebo The smaller toggles are for the two main line blocks. This is so I can hold outbound trains while still switching. The larger toggle is a "CTC/Local" throttle switch. This also controls the outbound/inbound signals. This may all change by next summer as I'm planning a DCC conversion.
rwundrock 1 year ago
Hey why are the dentures there?
JurassicGaint 2 years ago
Thy are located at the St. Paul "Bridge" Works. Bridge is another word for false teeth.
They are actually a plaster mold of my lower teeth used many years ago when I wore braces.
rwundrock 2 years ago 3
Run just like a prototype railroad. Good job on the narrating. Short and to the point. A+!
ACLTony 2 years ago
Thanks for the positive comments. When I was in college I wanted to become a TVradio/film producer or announcer. I found I wasn't a good enough announcer and TV production didn't pay enough.
I ended up as a broadcast engineer.
rwundrock 2 years ago