YouTube home Comedy Week on YouTube
Upload

Port Mackenzie Bimodal Loop

matsuboroughvideo matsuboroughvideo·57 videos
37
10,359

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like matsuboroughvideo's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike matsuboroughvideo's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add matsuboroughvideo's video to your playlist.

Uploaded on Aug 12, 2010

Great progress is underway at Port MacKenzie on two large construction projects. This one is the bimodal route, where truck and train will travel together until the rail diverges into a 100-car train loop. Up to 1.4 million cubic yards of dirt will be moved and 82.6 acres of land cleared this summer. By season's end that volume of dirt is the equivalent of filling a football field 630 feet deep. The video aims at the road. Contractor Bristol is cutting down a ridge to connect the road to Lu Young Lane. The 1.6 mile road begins at Point MacKenzie Road, joins the rail embankment then diverges toward Lu Young Lane. Excavators, scrapers, dump trucks, and Caterpillars have been at it for long hours this summer, hampered by the rain some. Work is expected to be completed for this phase in September.

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

All Comments (0)

Sign in now to post a comment!
  • Loading comment...
Loading...
Loading...
Working...
Sign in to add this to Watch Later