48HFP film project 2010 - Genre was Buddy Film, Line of diologue "We'll just have to wait", required charachter Charles Crosby, required prop was a brick. Shot in 6 hours in an empty bar in Ste. Genevieve, the owner kicked us out and was locking the inside door as we shot the exit scene. Audio was awful. We wrote the song and the script during the hour trip to the site. Gotta love it.
Link to this comment:
All Comments (0)