Upload

Loading icon Loading...

This video is unavailable.

Wilshire Ramps Reconstruction

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like Metro Los Angeles's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike Metro Los Angeles's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add Metro Los Angeles's video to your playlist.

Published on May 4, 2012

This spring, to improve long-term traffic flow on Wilshire Bl and the I-405 freeway, the project will begin reconstructing ramps joining Wilshire Bl and the I-405. This rebuilding begins with the demolition of two ramps: Westbound—Wilshire Bl on-ramp to northbound I-405; Northbound—I-405 off-ramp to westbound Wilshire Bl. For more information visit the project website at http://www.metro.net/projects/i-405/.

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

The interactive transcript could not be loaded.

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Loading...
Working...
to add this to Watch Later

Add to