Engineered Hardwood Flooring - Finished Walk-Thru

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
8,828
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Nov 19, 2007

Be sure to view our picture and video gallery @ http://www.osinstallations.com

Installation of 418 sq ft of Engineered Hardwood Flooring to include transitions and shoemold.

Category:

Howto & Style

Tags:

License:

Standard YouTube License

  • likes, 1 dislikes

Link to this comment:

Share to:
see all

All Comments (3)

Sign In or Sign Up now to post a comment!
  • The reason for the quarter round is used because base board needs to be installed level, having said that , most floors are not level which will leave a gap between the new floor and the baseboard. This is where the qtr/rnd needs to be used. Installing the qtr/rnd flush to the floor esures no gaps

  • look great!!

  • if you had removed the base board you wouldn't have had to install the godawfull quarter round.

    quarter round along the walls went out of vogue a long time ago all that aside,the floors look great !

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more