Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Part 2: Pouring the walls - Sno-Isle Building

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
136 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jan 6, 2010

Sno-Isle Skills Center Building Reconstruction, Part 2

The building that housed the Everett, Washington Sno-Isle TECH Skills Center administration offices and eight classrooms was destroyed by fire on May 5, 2009.

My video of the fire: http://www.youtube.com/watch?v=GkUpQD...

After the main slab was poured for the foundation and floor, construction workers began building forms for the walls. Lots of steel "rebar" and other materials were assembled.

This video shows the construction workers pouring concrete into the forms, and also leveling and finishing the concrete.

After the concrete has time to cure, the walls will be lifted up into place and fastened together to form the building shell.

I'll continue to make more videos in the next several months as I see interesting bits of the building construction process, and as I have time to make and process the videos.

Thanks for watching.
Tom

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
  • The Phoenix shall rise from the ashes

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more