December 12th, 2009. Space shuttle Endeavour has been rolled over from the Orbiter Proccessing Facility No. 2 (OPF-2) to theVehicle aAssemby Building (VAB). In te OPF, the shuttle has undergone post-STS-127 mission activites as well as preps for the upcoming STS-130 mission. In the VAB it wil be stacked with two solid rocket boostersand an external uel tank, beor being rolled out t the launch pad 39A next year.
Link to this comment:
All Comments (0)