Oak Ridge, TN. This was actually two stages in one. The first being the standard Bill Drill, followed up by another standard, the el Presidente (el Prez). My time on the Bill Drill was 2.53 seconds, but I was two points down for a total of 3.53 seconds. Sig Sauer P229.
Link to this comment:
All Comments (0)