Upload

Loading icon Loading...

This video is unavailable.

Caltrans: Grinding, drilling, other work have Fix50 in full swing

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to like The Sacramento Bee's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to dislike The Sacramento Bee's video.

Sign in to YouTube

Sign in with your Google Account (YouTube, Google+, Gmail, Orkut, Picasa, or Chrome) to add The Sacramento Bee's video to your playlist.

Published on Apr 22, 2014

Caltrans project manager Rod Murphy took a reporter from The Bee onto a portion of the W-X portion of Highway 50 on Tuesday morning to show the work that has already been done.

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Loading icon Loading...

Ratings have been disabled for this video.
Rating is available when the video has been rented.
This feature is not available right now. Please try again later.

Loading icon Loading...

Advertisement
Loading...
Working...
to add this to Watch Later

Add to