We at Permasteelisa North America engineered, fabricated and installed (9) stainless steel canopies, 25,000 sq. ft. of stainless mesh panels in the Great Hall, around the stair towers, ramps and scoreboard; stainless cladding on (7) escalators, etched mesh screens on (2) banks of elevators; over a half mile of stainless steel countertops on all levels and (3) column covers in the Yankee locker room.
Link to this comment:
All Comments (0)