Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Chasing a Train in the Rain at Grover, NC

Loading...

Sign in or sign up now!
2,080
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Apr 27, 2007

On the NS Piedmont Division mainline at milepost 419

Category:

Autos & Vehicles

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:

Uploader Comments (boardman49)

  • How fast were u going?

  • About 45 or 50.

  • I'm not sure but I would think that comment came from the train that was stopped. It was hard to tell since the moving train was blowing its horn part of the time. I can't say for certain if it was the conductor or the engineer.

see all

All Comments (7)

Sign In or Sign Up now to post a comment!
  • @crazyrailfan Yeah, haha!

  • nice lash up on the siding. 4 differnt road names. Man , we never get to see anything like that down here. Great Shot.

  • alguien me puede decir para que se usa el puente que se ve a los 43 segundos

  • I figured maybe 50. Thanks.

  • was that the engineer or conductor making the mock joke about being a sheppard and getting the flock out of there?

Loading...

0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more