Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

Bell System #1 Step in downtown Raleigh, NC - Part 3

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
748 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jan 23, 2011

By Evan Doorbell

PHONETRIPS.COM

reorder signal, blocked level, vacant level, digit absorbing selector, step office, step by step, number one step, #1 step, central office, Fuquay-Varina, Fuquay Varina, 2600 controlled carrier, supervision test, 2600 hertz, 2600 Hz, trunk group, absorbed digit, crosstalk, outgoing trunk, trunk noise, vacant level recording, southern bell telephone company, general telephone, GTE, t-carrier, t carrier, Tcarrier, battery cut off, battery cutoff, battery cut-off, talk battery, dialtone, dial tone, ring back, ringback, dial speed test, phone patch, phonepatch, telephone recordings, bell system, 20 Hz, step, panel, crossbar, partyline, partylines, #5 crossbar, crossbar 5, #5Xbar, cable pair trunk, cable pair trunks, repeater, repeaters, wire trunk, wire trunks

Category:

Science & Technology

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (2)

Sign In or Sign Up now to post a comment!
  • 1:16 & 2:31-- sounds like you had a TV on at the time this was recorded...you can hear the interference from the scanning circuits. Actually you can hear it at many more various times throughout the video.

  • 18:12

    That music could be a hit if the right record producer heard it.

    .

    .

    Cheers.

    from,

    del-boy.

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more