i was tagging along at Coopersville &Marne Railroad while they where draining the oil on their SW9. they were preping the motor for some cylinder work. took around 6 hours to drain the oil on it!
no 10 minute instant oil change here!
in this segment i climbed up to the top of the loco to get a better shot of the valvetrain, radiators, bell, and 3 chime horn.
Link to this comment:
All Comments (0)