Taunton Third Way bridge lift preparation

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
91,871
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Mar 23, 2011

Taunton Third Way bridge lift preparation. 23 March 2011.

. This is for the new bridge over the River Tone.

The Sarens crane apparently costs 27,000 UK pounds per day

Category:

Travel & Events

Tags:

License:

Standard YouTube License

  • likes, 5 dislikes

Link to this comment:

Share to:
see all

All Comments (4)

Sign In or Sign Up now to post a comment!
  • Great potential, but poor camera work, and the lack of any lifting, spoiled it for me. These giant cranes can put on quite a show, and to see basically nothing was frustrating.

  • Superb Footage, Thank

  • I've sen pics of this bridge lift, on my weekly world Crane Week..that's a Chinese SANY crane...

  • What is the SWL of this beast?

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more