Loading...
Uploaded by ihccrobotics on Nov 10, 2008
Students were assigned as their capstone project to utilize 2 robots and a conveyor to automatically place silicon wafers on a conveyor and restack them at the other end of the conveyor. A GE Fanuc PLC was used to control the operation.
Education
Standard YouTube License
Load more suggestions
Link to this comment:
All Comments (0)