Jacob White's Urban Green Energy wind turbines (Houston, TX)

Loading...

1,447
Loading...
Alert icon
Sign in or sign up now!
Alert icon
Loading...

Uploaded by on Jun 1, 2011

As a full-service energy management & sustainability consulting firm, Momentum Bay & GREEN POWER 4 TEXAS helped Jacob White Construction Company procure two 4 kW vertical axis wind turbines (VAWTs) from Urban Green Energy.

This onsite green power generation, along with rainwater catchment, an intensive green roof & other green building strategies, propelled Jacob White's headquarters to LEED Platinum certified status.

Jacob White's headquarters and two of their other buildings have achieved LEED Platinum certification (see http://www.HowToPlatinum.com).

This big picture & step-by-step "how-to" educational video teaches how onsite green energy complements other sustainable real estate strategies (like conservation, energy efficiency, healthy indoor & outdoor air quality, etc.) and how to install wind turbine systems from electronics, to the tower & foundation, and to the turbine.

Produced & directed by Mark Alan Robinson, MBA, LEED AP, CEM at Momentum Bay Associates LP (http://www.momentumbay.com), d.b.a., GREEN POWER 4 TEXAS (http://www.greenpowerbroker.com)

  • likes, 0 dislikes

Link to this comment:

Share to:

Uploader Comments ( MomentumBay )

  • Our team at GREEN POWER 4 TEXAS has truly enjoyed working as distributors-dealers-installer­s with Urban Green Energy.

  • November 2011, Urban Green Energy named Momentum Bay's GREEN POWER 4 TEXAS as the "Runner Up" winner in Urban Green Energy's August / September 2011 Top Sales Contest for GREEN POWER 4 TEXAS' leading sales volume among all distributor-dealers globally.

    One of the projects contributing to GREEN POWER 4 TEXAS' award is the Town of Addison 200-foot-tall Elevated Water Tower featuring 9 UGE-4K turbines (ARRA-09 compliant), to be installed by Landmark Structures (Fort Worth, Texas) before Feb 2012.

  • Urban Green Energy's eddy vertical axis wind turbine will be featured in tonight's (July 13, 2011) "ThisNewHouse" Season 2 Premiere on the diy network at 9 PM.

see all

All Comments (4)

Sign In or Sign Up now to post a comment!
  • Wow... that's a futuristic looking wind turbine.

  • Loading comment...
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more
    to add this to a playlist