This is the layout I have started in Iowa. I started this about 8 months ago working on the table and legs on wheels and track layout. It is a rough scenery because I have been busy or too lazy to work on it. I will most likely work more on it this winter as the snow will be 15" deep and about 2°F outside. (no cat walking in circles in this one, LOL)
@Gordaton There is a whole lot more in life that makes me feel young than model trains and YouTube.
RathbunDan 4 months ago
@RathbunDan This whole YouTube thing and the model trains must make you feel really young. Does it?
Gordaton 4 months ago
@Gordaton
Yep, I'm actually 71, but I'm not the oldest here by a long shot. Most seniors are looking and posting the oldies which I love.
RathbunDan 4 months ago
@RathbunDan Are you actually 71? You're probably the oldest YouTuber I ever saw...no offense.
Gordaton 4 months ago in playlist Liked
@Gordaton Most material I brought with me from Cal on my first layout the 22 car train around the loop video. I might have spent about 200 to $300.00 since for material and wood. I have a lot more to do like shrubery and build many of the structures and ground cover to do. I was busy this past summer with working on the house and also lazy to work on the layout. Total input from over the years I'd say about 2 grand.
RathbunDan 4 months ago
@RathbunDan How much did this layout cost you estimating so far?
Gordaton 4 months ago
@Gordaton I have a duel control power pack and a separate small powerpack for the streetcar.
RathbunDan 4 months ago
wait, how do you control 2 at once? they go on autopilot?
Gordaton 4 months ago