SPPC4807 Begin with left overs from Sat, Pipes in trays, thumb pistons, pedal board,facade pipes; Day 07 = day of rest; Day 08, many more facade pipes installed, air feeds to facade pipes, some facade pipes are non-speaking, toe studs above pedal board, swell shades pedal, draw knob install, St. Philip "stair master" aka foot pump bellows, plastic sheets installed on top of organ for hurricane proofing.